Power Grids and Utilities
Rogowski sensors can be permanently installed for long-term grid planning studies in places where it would be prohibitively expensive and unsafe to install conventional CTs on live circuits.
For example Fort Collins Utilities, Light and Power Department has initiated an automation project to monitor co-generation facilities and control and monitor distribution load centres (switches and fuse locations) using the RCT probes in numerous locations ensuring exact real time currents may be obtained for long range planning studies and for analysing switching operations during outage restoration.